Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1777410.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,585.00
Current Penalty: $6,951.00
Issuance Date: 01/17/2025
Nr Instances: 23
Nr Exposed: 1
Abatement Date: 02/06/2025
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 02/24/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/24/2025 | $6,951.00 | 02/06/2025 | Serious | |
| Penalty | Z: Issued | 01/17/2025 | $11,585.00 | 02/06/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
1910.147(c)(4)(ii)(B) The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about September 23, 2024, and at times prior thereto, the energy control procedures for plastic mold injection plant machines and equipment were not developed and used by employees for the control of hazardous energies, while performing servicing, cleaning and unjamming operations.