Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1758536.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,913.00
Current Penalty: $4,000.00
Issuance Date: 12/04/2024
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 02/28/2025
Gravity: 1
Report ID: 0627700
Contest Date:
Final Order: 12/30/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/30/2024 | $4,000.00 | 02/28/2025 | Other | |
Penalty | Z: Issued | 12/04/2024 | $6,913.00 | 01/23/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): Information concerning the equipment of the process did not include a complete and accurate piping and instrument diagram. On or about June 27, 2024 and at times prior thereto, at Stonewall Gas Plant, the employer did not ensure that piping and instrument diagram (P&ID)120084-PID-101 Rev. 5 was accurate. The following, instruments or controls, are inaccurate in the P&ID to include, but is not limited to: a.) In P&ID 120084-PID-101 Rev. 5, the pressure indication transmitter (PIT) PIT-6074 was labeled incorrect. It should be labeled as PIT-6004. b.) In P&ID 120084-PID-101 Rev. 5, the pressure control (PC) PC-6004 was labeled incorrect. It should be labeled as pressure indicator PI-6004. c.) In P&ID 120084-PID-101 Rev. 5, the pressure PY-6004 was labeled incorrect. It should be labeled as pressure PY-6074. d.) In P&ID 120084-PID-101 Rev. 5, the relations among PC-6004, PY-6004, PY-6003, and FV-6003A/B are incorrect. PC-6004 should be labeled as PI-6004 and does not associate with flow control valves FV-6003A/B.