Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 17551599
Citation: 01001
Citation Type: Serious
Abatement Date: 08/18/1995 I
Initial Penalty: $1,250.00
Current Penalty: $800.00
Issuance Date: 08/15/1995
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity: 03
Report ID: 0215600
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/17/1995 | $800.00 | 08/18/1995 | Serious | |
Penalty | Z: Issued | 08/15/1995 | $1,250.00 | 08/18/1995 | Serious |