Violation Detail
Standard Cited: 19100184 D Slings.
Inspection Nr: 1739983.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,296.00
Current Penalty: $4,148.00
Issuance Date: 07/25/2024
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 08/13/2024
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 09/23/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/23/2024 | $4,148.00 | 08/13/2024 | Serious | |
| Penalty | Z: Issued | 07/25/2024 | $8,296.00 | 08/13/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.184(d): Sling(s) and fastenings were not inspected each day or during use and were not removed from service when damaged or defective: (a) 5140 Martin Drive, Gap, PA; Small Parts Welding Station, 5-ton hoist - On or about April 9, 2024, the employee was using the metal chain sling hook to lift metal parts for welding weighing approximately 200lbs without a safety latch across the hook throat. The employee was exposed to a crushing hazard. (b) 5140 Martin Drive, Gap, PA; Single Frame Truck Weld Station, 10-ton hoist - On or about April 9, 2024, the metal chain sling hook which was used to lift and move trailers being assembled did not have a safety latch across the hook throat. Employees were exposed to a crushing hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.