Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1729357.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/05/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/29/2024
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 08/20/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/20/2024 | $0.00 | 08/29/2024 | Other | |
| Penalty | Z: Issued | 08/05/2024 | $0.00 | 08/29/2024 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: a) Cure Press lines/A thru C line and D thru F line- On or about February 21, 2024, and at times prior, employees were exposed to struck-by and caught-in hazards in that, the employer failed to ensure and certify that a periodic inspection of the energy control procedure was conducted for maintenance employees when they were engaged in activities such as, but not limited to, replacing and tightening of platen bolts for Cure Press machine.