Violation Detail
Standard Cited: 19260752 C02 Site layout, site-specific erection plan and construction sequence.
Inspection Nr: 1724903.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,421.00
Current Penalty: $12,421.00
Issuance Date: 07/26/2024
Nr Instances: 1
Nr Exposed: 22
Abatement Date: 08/21/2024
Gravity: 10
Report ID: 1032500
Contest Date: 08/15/2024
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 08/15/2024 | $12,421.00 | 08/21/2024 | Serious | |
Penalty | Z: Issued | 07/26/2024 | $12,421.00 | 08/21/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.752(c)(2): A firm, properly graded, drained area, was not readily accessible to work with adequate space for the safe storage of materials, and the safe operation of the erectors equipment. a) On January 31, 2024, and at times prior thereto, steel erection work occurred in mud and areas of standing water. Equipment including scissor lifts, aerial lifts, and rough terrain forklifts were used throughout the site. NOTE: Certification of corrective action AND supporting documentation as evidence of correction are required for this item.