Violation Detail
Standard Cited: 19100147 C04 II C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1723835.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $16,937.55
Issuance Date: 07/25/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/07/2024
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 09/05/2024
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/05/2024 | $16,937.55 | 10/07/2024 | Other | |
Penalty | Z: Issued | 07/25/2024 | $16,131.00 | 08/09/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
1910.147(c)(4)(ii)(C): The energy control procedure did not include specific procedural steps for the placement, removal and transfer of lockout devices or tagout devices and the responsibility for them. On or about January 27, 2024, the employer failed to address specific steps for removal of lockout devices in the energy control procedure for employees for servicing and/or performing maintenance on an Altec DC 1317 woodchipper.