Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1719390.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,688.00
Current Penalty: $4,688.00
Issuance Date: 01/05/2024
Nr Instances: 3
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0216000
Contest Date:
Final Order: 02/20/2024
Related Event Code (REC): I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/05/2024 | $4,688.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 a) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. The employees were exposed to a fall of 60 feet. location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 b) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were working from the crossbraces. The employees were exposed to a fall of 60 feet. location: exterior of building, Prospect St. & Hawthorne Ave. on or about: 7/12/23 c) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were working from the frames themselves. The employees were exposed to a fall of 60 feet. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.