Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1719144.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,765.00
Current Penalty: $2,765.00
Issuance Date: 07/02/2024
Nr Instances: 2
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 07/30/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/02/2024 | $2,765.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3):Exit route(s) were not kept free and unobstructed: a) At 26 2nd Street SW, Decatur, AL, on or about January 3, 2024, the exit doors in warehouse number 9, which exposes employees to entrapment and fire hazards. To abate this hazard, the employer must ensure that exit doors are kept free and unobstructed. b) At 26 2nd Street SW, Decatur, AL, on or about January 3, 2024, the exit doors in warehouse number 7, which exposes employees to entrapment and fire hazards. To abate this hazard, the employer must ensure that exit doors are kept free and unobstructed.
Translate