Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1703194.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $11,524.00
Current Penalty: $2,500.00
Issuance Date: 03/21/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/25/2024
Gravity: 5
Report ID: 0213600
Contest Date: 04/05/2024
Final Order: 08/01/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/01/2024 | $2,500.00 | 03/25/2024 | Other | |
Penalty | C: Contested | 04/09/2024 | $11,524.00 | 03/25/2024 | Serious | |
Penalty | Z: Issued | 03/21/2024 | $11,524.00 | 03/25/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Spray painting area - On or about 1/30/24, employee(s) were not able to open the exit door from the inside special knowledge to unlock the dead-bolt. ABATEMENT CERTIFICATION REQUIRED