Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1703186.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,453.00
Current Penalty: $4,000.00
Issuance Date: 01/24/2024
Nr Instances: 1
Nr Exposed: 64
Abatement Date: 01/30/2024
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 02/13/2024
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/13/2024 | $4,000.00 | 01/30/2024 | Serious | |
| Penalty | Z: Issued | 01/24/2024 | $6,453.00 | 01/30/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3): Exit Routes and Emergency Planning - Exit routes must be free and unobstructed. No materials or equipment may be placed, either permanently or temporarily, within the exit route. The exit access must not go through a room that can be locked, such as a bathroom, to reach an exit or exit discharge, nor may it lead into a dead-end corridor. Stairs or a ramp must be provided where the exit route is not substantially level. 32 City Hall Avenue: On or about, October 12, 2023, Employer failed to keep exit routes free and unobstructed by materials or equipment which were temporarily placed within the exit route restricting Employee egress ability.
Translate