Violation Detail
Standard Cited: 19260251 D06 III Rigging equipment for material handling.
Inspection Nr: 1699177.015
Citation: 01001
Citation Type: Other
Abatement Date: 05/01/2024 2
Initial Penalty: $11,292.00
Current Penalty: $5,000.00
Issuance Date: 03/15/2024
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 04/16/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/16/2024 | $5,000.00 | 05/01/2024 | Other | |
Penalty | Z: Issued | 03/15/2024 | $11,292.00 | 04/10/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
1926.251(d)(6)(iii): Removal from service. Natural and synthetic fiber rope slings shall be immediately removed from service if broken or cut fibers are present: a) On or about September 22, 2023, at 8 Canal Street, New Orleans, LA, employees engaged in demolition activities were exposed to stuck by hazards from slings that had broken and cut fibers.