Violation Detail

Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.

Inspection Nr: 1680840.015

Citation: 01001

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $10,046.00

Current Penalty: $5,000.00

Issuance Date: 01/10/2024

Nr Instances: 2

Nr Exposed: 10

Abatement Date: 03/26/2024

Gravity: 5

Report ID: 0214200

Contest Date: 02/01/2024

Final Order: 05/29/2024

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 05/29/2024 $5,000.00 03/26/2024 Other  
Penalty C: Contested 02/05/2024 $10,046.00 02/26/2024 Serious  
Penalty Z: Issued 01/10/2024 $10,046.00 02/26/2024 Serious  

Text For Citation: 01 Item/Group: 001 Hazard:

29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process: a) Methanol storage tank T-203 The conservation vents with flame arrestors were missing on P&ID drawing EWR-PID-TF-METH for methanol storage tanks T-203. b) Methanol storage tank T-206 The conservation vents with flame arrestors were missing on P&ID drawing EWR-PID-TF-METH for methanol storage tanks T-206. Violation occurred on or about 11/3/23.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.