Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1673337.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/16/2023
Initial Penalty: $10,938.00
Current Penalty: $0.00
Issuance Date: 09/29/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0523300
Contest Date: 10/30/2023
Final Order: 07/01/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/01/2024 | $0.00 | 10/16/2023 | Serious | |
Penalty | C: Contested | 10/31/2023 | $10,938.00 | 10/16/2023 | Serious | |
Penalty | Z: Issued | 09/29/2023 | $10,938.00 | 10/16/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about May 31, 2023, procedures were not utilized for the control of potentially hazardous energy when employees performed die changes of the Trumpf TruBend model 7036 press brake.