Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1672039.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,162.00
Current Penalty: $5,600.00
Issuance Date: 07/07/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 08/02/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/02/2023 | $5,600.00 | Serious | ||
Penalty | Z: Issued | 07/07/2023 | $11,162.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. a. On or about March 8, 2023, in the Dice Pack area, employees were required to service and maintain machines and equipment, specifically, the Armor Inox Metal Detector. The employer did not conduct an annual or more frequent inspection of the energy control procedures to ensure that the procedures and requirements of the standard were being followed.