Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1662133.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $78,125.00
Current Penalty: $8,036.40
Issuance Date: 09/14/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0213400
Contest Date:
Final Order: 11/15/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2023 | $8,036.40 | Serious | ||
Penalty | Z: Issued | 09/14/2023 | $78,125.00 | Repeat |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) 40 Turner Place Piscataway, NJ 08854 D-2 Winder cabinet On or about 4/08/2023, maintenance and/or service was being performed on D-2 Winder without utilizing steps for de-energizing and lock-out; exposing mechanic(s) to nip-points of moving machine parts, which yielded finger amputation injury.