Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1659818.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,687.00
Current Penalty: $2,600.00
Issuance Date: 07/28/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 1
Report ID: 0521700
Contest Date:
Final Order: 08/14/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/14/2023 | $2,600.00 | Serious | ||
Penalty | Z: Issued | 07/28/2023 | $4,687.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(5)(i): Visible gauges were not maintained so as to indicate or ensure that the required air velocity is maintained. a) Chicago Booth Manufacturing, Inc. located at 5000 W Roosevelt Rd., Chicago, IL 60644: On or about March 29, 2023, the employer failed to ensure that the manometer on the dry spray booth, model number FPX-1086, was maintained in working order. Employees routinely sprayed flammable materials inside the spray booth including but not limited to sealers and top coats.