Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1659283.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,697.00
Current Penalty: $7,535.00
Issuance Date: 09/12/2023
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/06/2023
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 10/04/2023
Related Event Code (REC):
Emphasis:
Substance: 0450
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/04/2023 | $7,535.00 | 10/06/2023 | Other | |
| Penalty | Z: Issued | 09/12/2023 | $6,697.00 | 10/06/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B):The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process. a) 66 Kettles process area - On or about March 27, 2023 the employer did not ensure that the piping and instrument diagram (P&ID) accurately represented the existing equipment on reactor 4A of the 66 kettles process in that rupture disk PSE 820-009 was listed on the P&ID as being rated for 45 PSI at 100 Celsius, whereas the rupture disk and other design documents report it being rated for 45 PSI at 72 Fahrenheit. Failure to provide accurate P&IDs may potentially cause incorrect operations or maintenance. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.