Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1658504.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $0.00
Issuance Date: 08/23/2023
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 09/19/2023
Gravity: 10
Report ID: 0625400
Contest Date: 09/15/2023
Final Order: 12/04/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/04/2023 | $0.00 | 09/19/2023 | Other | |
| Penalty | C: Contested | 09/20/2023 | $15,625.00 | 09/19/2023 | Serious | |
| Penalty | Z: Issued | 08/23/2023 | $15,625.00 | 09/19/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. On or about March 23, 2023, at the Samsung Semiconductors facility located in Austin, Texas, the employer did not develop and implement a written piping inspection procedure for PSM covered process safeguards, such as but not limited to the following equipment UVIR detectors RAHH-15 (DEV-0000144), exposing employees to fire and burn hazards.
Translate