Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1656872.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,586.00
Current Penalty: $2,510.20
Issuance Date: 06/12/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/27/2023
Gravity: 1
Report ID: 0523900
Contest Date:
Final Order: 06/26/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/26/2023 | $2,510.20 | 06/27/2023 | Serious | |
| Penalty | Z: Issued | 06/12/2023 | $3,586.00 | 06/27/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard were being followed: (a) Throughout the facility; Periodic inspections of energy control procedures were not conducted on at least an annual basis for equipment including, but not limited to, the Bridgeport F-362-00-093 machine (Serial No. 19-0161), Wilton Lathe, OmniTurn CNC Lathe, Trak DPM machines, and the Bridgeport machine (Serial No. 4534).