Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1656499.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $3,349.00
Current Penalty: $2,009.40
Issuance Date: 05/18/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/27/2023
Gravity: 5
Report ID: 0728900
Contest Date: 06/20/2023
Final Order: 11/13/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/13/2023 | $2,009.40 | 11/27/2023 | Serious | |
Penalty | C: Contested | 06/21/2023 | $3,349.00 | 06/14/2023 | Serious | |
Penalty | Z: Issued | 05/18/2023 | $3,349.00 | 06/14/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees. The employer was failing to protect employee(s) from fall injuries. This was most recently documented on or about March 14, 2023, at 10717 S. 126th Ct. Omaha, Nebraska. The employer failed to ensure that all guardrails were installed along the open sides and ends of the mobile scaffold prior to release.