Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1655169.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,875.00
Current Penalty: $4,125.00
Issuance Date: 08/31/2023
Nr Instances: 1
Nr Exposed: 23
Abatement Date: 02/01/2024
Gravity: 5
Report ID: 0626700
Contest Date: 09/27/2023
Final Order: 01/29/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/29/2024 | $4,125.00 | 02/01/2024 | Serious | |
Penalty | C: Contested | 11/16/2023 | $6,875.00 | 09/11/2023 | Serious | |
Penalty | Z: Issued | 08/31/2023 | $6,875.00 | 09/11/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained. a) On or about March 17, 2023, on a spray booth, where the Dwyer, Mark II, Model 25 Manometer was not equipped with an operational manometer or other device to indicate air velocity was maintained.