Violation Detail

Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).

Inspection Nr: 1654794.015

Citation: 01001

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $13,394.00

Current Penalty: $10,715.20

Issuance Date: 08/30/2023

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 09/19/2023

Gravity: 5

Report ID: 0626700

Contest Date:

Final Order: 09/29/2023

Related Event Code (REC): R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 09/29/2023 $10,715.20 09/19/2023 Serious  
Penalty Z: Issued 08/30/2023 $13,394.00 09/19/2023 Serious  

Text For Citation: 01 Item/Group: 001 Hazard:

29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. a) At the amusement park, the energy control procedures used by employees when inspecting the Flare, 22M Giant Loop roller coaster did not clearly and specifically outline the steps for isolating the electric and kinetic energy sources.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.