Violation Detail
Standard Cited: 19100036 B02 Design and construction requirements for exit routes.
Inspection Nr: 16529000
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $280.00
Current Penalty: $280.00
Issuance Date: 11/23/1977
Nr Instances: 1
Nr Exposed:
Abatement Date: 11/26/1977
Gravity:
Report ID: 0626300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate