Violation Detail
Standard Cited: 19100036 B02 Design and construction requirements for exit routes.
Inspection Nr: 1651629.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,122.00
Current Penalty: $3,000.00
Issuance Date: 05/19/2023
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 07/10/2023
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 07/06/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/06/2023 | $3,000.00 | 07/10/2023 | Serious | |
| Penalty | Z: Issued | 05/19/2023 | $5,122.00 | 07/10/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(b)(2): More than two exit routes were not available in the workplace where the number of employees, the size of the building, its occupancy, or the arrangement of the workplace was such that all employees would not be able to evacuate safely during an emergency: Second Floor Warehouse: On, or about, February 22, 2023, an inside flammable storage room had been built in the exit route leading from the warehouse to the exterior fire escape. This created a dead end corridor in the warehouse section of the building that exceeded fifty feet and a common path of travel of greater than 100 feet before employees reached the Production Area where there was access to other exit routes. A stairwell located in the warehouse did not meet the requirements of an exit route and was marked as such.
Translate