Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1649574.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,688.00
Current Penalty: $0.00
Issuance Date: 07/17/2023
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 08/09/2023
Gravity: 10
Report ID: 0112300
Contest Date: 08/10/2023
Final Order: 01/05/2024
Related Event Code (REC): C;I
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/05/2024 | $0.00 | 08/09/2023 | Serious | |
| Penalty | C: Contested | 08/10/2023 | $4,688.00 | 08/09/2023 | Serious | |
| Penalty | Z: Issued | 07/17/2023 | $4,688.00 | 08/09/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) Stringing Department: On or about February 9, 2023 an exit door in the northeast corner of the building that was marked as an exit was locked with a locking knob lock and a deadbolt style lock that were maintained locked so that the door could not be readily opened. (b) Plating Department: On or about February 9, 2023 an exit door on the west side of the building, adjacent to the acid copper bath, was corroded shut so that it could not be opened. (c) Vibrating Department: On or about February 9, 2023 an exit door on the west side of the building, adjacent to several large vibrators, was corroded shut so that it could not be opened.