Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1649203.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,641.00
Current Penalty: $6,641.00
Issuance Date: 03/15/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/01/2023
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 04/11/2023
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/15/2023 | $6,641.00 | 05/01/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): Tube Bending Area: On, or about, February 3, 2023, an employee suffered a finger amputation while attempting to reposition a part in the Eaton Leonard CNC controlled tube bending machine. The bending area was not provided with safeguarding during automatic mode.
Translate