Violation Detail
Standard Cited: 19100119 L01 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1643586.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/31/2023
Initial Penalty: $15,625.00
Current Penalty: $0.00
Issuance Date: 07/05/2023
Nr Instances: 1
Nr Exposed: 125
Related Event Code (REC):
Gravity: 10
Report ID: 0728500
Contest Date: 07/31/2023
Final Order: 03/04/2024
Emphasis:
Substance: 1190
Substance: T127
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/04/2024 | $0.00 | 07/31/2023 | Serious | |
Penalty | C: Contested | 07/31/2023 | $15,625.00 | 07/31/2023 | Serious | |
Penalty | Z: Issued | 07/05/2023 | $15,625.00 | 07/31/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(l)(1): The employer did not establish or implement written procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process. The employer is failing to protect employees from hazards related to exposures to highly hazardous chemicals. This was most recently documented on January 10, 2023, at the worksite located at 299 Extension Street, Verona, Missouri. The employer did not implement a written management of change procedures when replacing a vessel in Area B with a new vessel. The employer removed a glass lined vessel from Area B, in building V10 and replaced it with a stainless-steel vessel. The stainless-steel vessel is not a "replacement in kind," as the size of the stainless-steel vessel was larger than the glass lined vessel, thus increasing the capacity of the vessel, which leads to an increase in the amount of the highly hazardous chemicals used to manufacture choline chloride and/or choline bitartrate.