Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1643237.015
Citation: 01001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 06/07/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 07/03/2023
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/03/2023 | $15,625.00 | Other | ||
| Penalty | Z: Issued | 06/07/2023 | $15,625.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about January 9, 2023, the Company did not fully document the machine-specific lockout/tagout procedures for performing maintenance activities on the gantry robot (Servos drive) on the HH-02 machine located in the facility's Heat Treat Department.
Translate