Violation Detail
Standard Cited: 19260501 A02 Duty to have fall protection.
Inspection Nr: 1642131.015
Citation: 01001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $31,252.00
Current Penalty: $15,750.00
Issuance Date: 05/02/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 05/12/2023
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 07/17/2023
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/17/2023 | $15,750.00 | 05/12/2023 | Willful | |
Penalty | Z: Issued | 05/02/2023 | $31,252.00 | 05/12/2023 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.501(a)(2): The employer did not determine if the walking/working surfaces on which its employees were to work on, had the strength and structure integrity to support employees safely: a. The roof over the paint booth - On or about December 28, 2022, the employer failed to determine if the roof had the strength and structural integrity to support employees safely, employees were allowed to perform work on the roof of a building which had significant degradation in the substructure that exposed employees to fall hazard of greater than 20 feet. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.