Violation Detail
Standard Cited: 19260066 B05 I Criteria for design and construction of spray booths.
This violation item has been deleted.
Inspection Nr: 1640492.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $7,813.00
Current Penalty: $0.00
Issuance Date: 06/14/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 08/02/2023
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 07/17/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/17/2023 | $0.00 | 08/02/2023 | Serious | |
Penalty | Z: Issued | 06/14/2023 | $7,813.00 | 08/02/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.66(b)(5)(i): Visible gauges or audible alarm or pressure activated devices were not installed to indicate or ensure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media. Shop C - Spray Booth: On or about December 21, 2022, a spray booth where flammable liquids were used including, among others, a Category 3 flammable lacquer (Care Lacquer Retarder, C1611), did not have visible gauges or an audible alarm or a pressure activated device installed to indicate or ensure that the required air velocity was maintained.