Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1632581.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $15,625.00
Current Penalty: $10,940.00
Issuance Date: 05/01/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0215000
Contest Date: 05/25/2023
Final Order: 08/16/2023
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/16/2023 | $10,940.00 | Serious | ||
Penalty | C: Contested | 05/26/2023 | $15,625.00 | Serious | ||
Penalty | Z: Issued | 05/01/2023 | $15,625.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. Location: a) Worksite; Spiral freezer room a) On or about 11/03/2022, lockout/tagout (LOTO) procedures were not utilized for the night shift employee during cleaning operations in the spiral freezer room for machines such as the spiral conveyor belt system.