Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1614600.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,036.00
Current Penalty: $4,821.60
Issuance Date: 01/25/2023
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 02/06/2023
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 02/08/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/08/2023 | $4,821.60 | 02/06/2023 | Serious | |
| Penalty | Z: Issued | 01/25/2023 | $8,036.00 | 02/06/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) In the Hearing Protection Zone Production Area - On or about 08/15/2022, employees were exposed to fire and entrapment hazards while working in the area where a designated emergency exit door had panic door hardware along with a security bolt sliding style lock.
Translate