Violation Detail
Standard Cited: 19100023 D07 Ladders.
This violation item has been deleted.
Inspection Nr: 1614229.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $10,877.00
Current Penalty: $0.00
Issuance Date: 10/05/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/01/2022
Gravity: 10
Report ID: 0316300
Contest Date: 11/07/2022
Final Order: 02/15/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 02/15/2023 | $10,877.00 | 11/01/2022 | Serious | |
Penalty | F: Formal Settlement | 02/15/2023 | $0.00 | 11/01/2022 | Serious | |
Penalty | Z: Issued | 10/05/2022 | $10,877.00 | 11/01/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.23(d)(7): The employer did not ensure that grab bars extend 42 inches (1.1 m) above the access level or landing platforms served by the ladder: a) BAE Shipyard: On or about August 01, 2022, an employee required to access the top of a 20ft blast pot to operate a lever, was not provided with a grab bar at the top of the ladder. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.