Violation Detail
Standard Cited: 19100269 A02 II E Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1607978.015
Citation: 01001
Citation Type: Other
Abatement Date: 09/01/2023 2
Initial Penalty: $14,502.00
Current Penalty: $9,529.00
Issuance Date: 01/10/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0111400
Contest Date: 01/31/2023
Final Order: 09/25/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/25/2023 | $9,529.00 | 09/01/2023 | Other | |
Penalty | C: Contested | 01/31/2023 | $14,502.00 | 01/19/2023 | Serious | |
Penalty | Z: Issued | 01/10/2023 | $14,502.00 | 01/19/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(a)(2)(ii)(E): Each qualified employee did not receive adequate training in the recognition of electrical hazards and the techniques necessary to control or avoid them. Location: Eversource underground vault TNV 675A at Bowdoin St, Boston, MA On or about July 12, 2022, employees were exposed to electrical hazards, where each employee did not receive adequate training in the recognition of electrical hazards and the techniques necessary to control or avoid them.