Violation Detail
Standard Cited: 19260451 C03 General requirements.
Inspection Nr: 1597673.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 09/26/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/30/2022
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 11/16/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/26/2022 | $14,502.00 | 09/30/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: a- 13 Foundry Boulevard, Mount Holly NJ - Workers were exposed to fall hazards, in excess of 22 feet 2 inches to the ground surface below, when performing siding installation and other related activities from a pump jack scaffold whose posts/legs were not plumb and braced to prevent swaying and displacement. Condition observed on or about 05/23/22. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.