Violation Detail
Standard Cited: 19260452 J02 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 1590322.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,786.00
Current Penalty: $3,110.90
Issuance Date: 10/13/2022
Nr Instances: 2
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0214500
Contest Date:
Final Order: 08/21/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2023 | $3,110.90 | Serious | ||
Penalty | Z: Issued | 10/13/2022 | $4,786.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. a) Employees installed Tyvek on the building's fa�ade from 2 pump jack scaffolds that were over 50 feet high which did not have triangular bracing installed at the bottom and other points as necessary, on or about 4/15/22, at or near 361-367 Marshall St., Paterson NJ. b) Employees installed Tyvek on the building's fa�ade from 2 pump jack scaffolds that were over 50 feet high which did not have triangular bracing installed at the bottom and other points as necessary, on or about 5/3/22, at or near 361-367 Marshall St., Paterson NJ.