Violation Detail
Standard Cited: 19100147 F01 V The control of hazardous energy (lockout/tagout).
Inspection Nr: 1589002.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,801.00
Current Penalty: $3,000.00
Issuance Date: 08/12/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 09/12/2022
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/12/2022 | $3,000.00 | Serious | ||
| Penalty | Z: Issued | 08/12/2022 | $5,801.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(f)(1)(v): Deenergize all systems and reapply energy control measures in accordance with paragraph (d) of this section to continue the servicing and/or maintenance. a) On April 4, 2022, in the warehouse, an employee was conducting servicing and maintenance on the Bobst, Flat Die Cutter Machine, model SPO 1600, while testing the newly installed switch, the machine cycled while the employee was inside the machine. The employer did not ensure that employees testing the equipment deenergize all systems and reapply energy control measures in accordance with paragraph (d) of this section to continue servicing the equipment.