Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1588408.015
Citation: 01001
Citation Type: Serious
Abatement Date: 08/10/2022 2
Initial Penalty: $7,252.00
Current Penalty: $3,626.00
Issuance Date: 07/22/2022
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC): C
Gravity: 5
Report ID: 0626600
Contest Date:
Final Order: 08/19/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/19/2022 | $3,626.00 | 08/10/2022 | Serious | |
Penalty | Z: Issued | 07/22/2022 | $7,252.00 | 08/10/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: On or about April 7, 2022, and at times prior thereto, throughout the facility where main walkways to exit routes were blocked with pallets of material.