Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1586887.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,052.00
Current Penalty: $7,831.20
Issuance Date: 06/23/2022
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 07/20/2022
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 07/11/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/11/2022 | $7,831.20 | 07/20/2022 | Serious | |
| Penalty | Z: Issued | 06/23/2022 | $13,052.00 | 07/20/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment: a) On or about March 25, 2022, at the facility, employees did not deenergize the equipment according to established procedures when removing the vacuum pump on the fuller airlock rotary valve to inspect for air leaks.