Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1584584.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,113.00
Current Penalty: $1,056.50
Issuance Date: 06/02/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0418200
Contest Date:
Final Order: 06/21/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/21/2022 | $1,056.50 | Serious | ||
Penalty | Z: Issued | 06/02/2022 | $2,113.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Warehouse-Near Loading Dock: On or about 12/6/2021, employees were exposed to fire and entrapment hazards, in that the emergency exit doors were locked while employees were blending or preparing product for distribution.