Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1582835.015
Citation: 01001
Citation Type: Serious
Abatement Date: 08/30/2022 2
Initial Penalty: $7,925.00
Current Penalty: $7,925.00
Issuance Date: 08/16/2022
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 09/14/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/16/2022 | $7,925.00 | 08/30/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(d):The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): a) 6071 Durham Road Pipersville, PA 18947: On or about March 11, 2022, the employer did not have an established procedure in place for the boiler circulation pump located in Greenhouse Section 1B to control the release of hazardous energy.