Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1580181.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,327.00
Current Penalty: $7,500.00
Issuance Date: 04/05/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/20/2022
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 05/02/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/02/2022 | $7,500.00 | 05/20/2022 | Serious | |
| Penalty | Z: Issued | 04/05/2022 | $12,327.00 | 05/20/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii):Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A) and 1910.147(c)(4)(ii)(B): Assembly Pump Room: On or about February 23, 2022, stored pneumatic energy in the form of nitrogen compressed gas, injured an employee when the pressure in the high-pressure line was not relieved due to the absence of a specific procedure addressing this aspect of the lockout/tagout procedure during maintenance and the absence of a pressure relief valve.