Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1575631.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,396.00
Current Penalty: $6,837.60
Issuance Date: 05/20/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/14/2022
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 06/16/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/16/2022 | $6,837.60 | 06/14/2022 | Serious | |
| Penalty | Z: Issued | 05/20/2022 | $11,396.00 | 06/14/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(d)(6):Prior to starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and de-energization of the machine or equipment had been accomplished. a. Poultry Plant Control Center - On or about February 1, 2022, an authorized employee locked out the number 3 Cross Crax Screw but did not verify if the Cross Crax Screw was isolated and de-energized prior to performing maintenance.