Violation Detail
Standard Cited: 19100095 B01 Occupational noise exposure.
Inspection Nr: 1573212.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,629.00
Current Penalty: $6,879.00
Issuance Date: 07/06/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 03/31/2023
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 07/27/2022
Related Event Code (REC):
Emphasis:
Substance: 8110
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 12/09/2022 | $6,879.00 | 03/31/2023 | Serious | |
| Penalty | I: Informal Settlement | 07/27/2022 | $6,879.00 | 10/04/2022 | Serious | |
| Penalty | Z: Issued | 07/06/2022 | $8,629.00 | 10/04/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.95(b)(1): When employees were subjected to sound exceeding those listed in Table G-16, feasible administrative and/or engineering controls were not utilized: a) Orange Products - On or about April 19, 2022, an employee operating lapping machines, was exposed to continuous noise at 206.6 % of the permissible exposure level of 90 dBA or an 8 hour time weighted average (TWA) noise exposure of 95.2 dBA. This exposure occurred over a 488 minute sampling period. The employer did not implement feasible administrative and/or engineering controls. ABATEMENT STEPS ARE AS FOLLOW: STEP 1 - As an interim protective measure and when administrative or engineering controls fail to reduce sound levels within the levels of table G-16, effective hearing protection shall be provided and used by all exposed employees. In addition, an effective hearing conservation program in accordance with 29 CFR 1910.95(c) through (n) shall be maintained. STEP 2 - A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to noise as referenced in this citation. This plan shall include, at a minimum, target dates for the following actions which must be consistent with the dates required by this citation: 1. Evaluation of engineering control options; 2. Selection of optimum control method and completion of design; 3. Procurement, installation and operation of selected control measures; 4. Testing and acceptance or modification/redesign of controls. Note: All proposed control measures shall be approved for each particular use by a competent industrial hygienist or other technically qualified person. Ninety (90) day progress reports are required during the abatement period. (The 90 day requirement can be shortened or lengthened by the area director depending on the specific circumstances.) STEP 3 - Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.