Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1556620.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,324.00
Current Penalty: $9,324.00
Issuance Date: 03/02/2022
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 03/23/2023
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 03/23/2022
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/23/2022 | $9,324.00 | 03/23/2023 | Other | |
| Penalty | Z: Issued | 03/02/2022 | $9,324.00 | 03/28/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): The point of operation of the machinery was not guarded to prevent employee(s) from having any part of their body in the danger zone during operating cycle: a) Gnutti #4, Martin No. 12 hydraulic power marking machine - Employees were exposed to a point of operation hazard while operating a hydraulically powered marking machine that was not equipped with adequate point of operation guarding and/or guarding devices, on or about September 24, 2021. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate