Violation Detail
Standard Cited: 19260964 B04 I
Inspection Nr: 1556056.015
Citation: 01001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $10,360.00
Current Penalty: $8,288.00
Issuance Date: 03/24/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0418800
Contest Date: 04/25/2022
Final Order: 06/05/2023
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 06/05/2023 | $8,288.00 | Other | ||
| Penalty | C: Contested | 04/26/2022 | $10,360.00 | Serious | ||
| Penalty | Z: Issued | 03/24/2022 | $10,360.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
Serious 29 C.F.R. 1926.964(b)4)(i): Before employees install lines parallel to existing energized lines, the employer shall make a determination of the approximate voltage to be induced in the new lines, or work shall proceed on the assumption that the induced voltage is hazardous. On or about October 1, 2021, at 810 Charlotte Avenue FPL substation, West Palm Beach, Florida, employees installing lines parallel to existing energized lines did not proceed on the assumption that induced voltage was hazardous.