Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
This violation item has been deleted.
Inspection Nr: 1554250.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $0.00
Issuance Date: 01/21/2022
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 03/10/2022
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 02/09/2022
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/09/2022 | $0.00 | 03/10/2022 | Serious | |
| Penalty | Z: Issued | 01/21/2022 | $14,502.00 | 03/10/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.304(g)(5): Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective. a) On or about September 7, 2021 at Tri-State Storage in Chesapeake Ohio, the employer did not ensure that employees working on equipment such as but not limited to the Viking VK-2 115 volt, rolling gate controller, did not become part of the path to ground.