Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1552945.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,052.00
Current Penalty: $13,052.00
Issuance Date: 02/01/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/11/2022
Gravity: 10
Report ID: 0317700
Contest Date:
Final Order: 03/07/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 02/01/2022 | $13,052.00 | 02/11/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Production Floor - On or about August 27, 2021, lockout/tagout procedures were not implemented, on the HP8505-K15.00 Conveyor (Cooler Infeed) system. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Translate