Violation Detail
Standard Cited: 19100147 F01 V The control of hazardous energy (lockout/tagout).
Inspection Nr: 1552923.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,753.00
Current Penalty: $6,827.00
Issuance Date: 11/03/2021
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 11/23/2021
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 12/01/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/01/2021 | $6,827.00 | 11/23/2021 | Serious | |
| Penalty | Z: Issued | 11/03/2021 | $9,753.00 | 11/23/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(f)(1)(v):All systems were not de-energized and energy control measures reapplied in accordance with paragraph (d) of this section to continue the servicing and/or maintenance: On or about September 17, 2021, the employer failed to ensure employees performing troubleshooting on the Spray Booth One Conveyor Line (doghouse), re-applied lockout prior to working on the machine again.
Translate